Reorder Point Calculator
Work out when a material should be reordered.
- 2 min
- You get: Reorder point, distance from it and what to do
- Free, no sign-up
Result · 30 Oct 2026
Reorder nowReorder Point Calculator
440 below reorder point
- Reorder point
- 2240
- Safety stock used
- 1040
- Stock plus on order
- 1800
- Days before reorder
- 0
What to do now
- 01Place the order today.
- 02Ask the supplier for the earliest dispatch date.
- 03Confirm the date in writing.
Reorder point is average daily use times lead time, plus safety stock. If you leave safety stock blank, it is the extra you would use on a slow, busy month: maximum use times longest lead time, minus average use times normal lead time.
Use this with
- GuideHow to prevent material shortagesRead the guide →
- ProblemMaterial shortagesSee the problem guide →
- ProcessPurchase requirement to material receivedSee the full process →
- lamp
lamp could keep these inputs current from your existing systems, instead of you entering them by hand.
Join the waitlist →See how lamp works →
Does this miss something you check?Suggest an addition →
