Material Shortage Risk Check
Find out if available and incoming material will cover planned production.
- 3 min
- You get: Net stock, days of cover, projected shortage and what to do now
- Free, no sign-up
Result · 28 Oct 2026
CriticalMaterial Shortage Risk Check
Projected shortage: 210 kg
- Net available
- 440 kg
- Days of cover
- 2.8
- Runs out about
- 30 Oct
- Stock on incoming date
- 0 kg
- Projected available
- 940 kg
- Requirement
- 1150 kg
What to do now
- 01Confirm the 31 Oct delivery today.
- 02Check alternate supplier availability for at least 250 kg.
- 03Review jobs that need P-42 Resin after 30 Oct.
- 04Update the production plan if the supplier cannot confirm.
Net available is usable stock minus reserved stock. Days of cover is net available divided by daily use. Projected available adds the incoming lot if it arrives before the required date. Shortage is the requirement plus safety stock minus projected available.
Use this with
- GuideHow to prevent material shortagesRead the guide →
- ProblemMaterial shortagesSee the problem guide →
- ProcessPurchase requirement to material receivedSee the full process →
- lamp
lamp could keep these inputs current from your existing systems, instead of you entering them by hand.
Join the waitlist →See how lamp works →
Does this miss something you check?Suggest an addition →