lamp.
ResourcesPricingAbout
Dispatch and logistics12 checksonceabout 10 minutes, estimate; adjust for site

Transporter onboarding checklist

This checklist covers details and agreements before using a new transporter. Tick each item at the point of work and record any failure.

0 of 12 checked

1Check the order and goods

  • Transporter legal details are obtainedMUST
  • Driver and vehicle verification method is set
  • Service area is recordedMUST
  • Freight rate basis is written

2Prepare movement and documents

  • Loading responsibility is agreed
  • Damage reporting method is agreedMUST
  • Proof-of-delivery deadline is agreed
  • Billing document requirements are noted

3Hand over and close

  • Emergency contact is saved
  • Backup vehicle rule is agreed
  • Trial shipment is reviewed
  • Approval to use transporter is recordedMUST
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Transporter legal details are obtained; Driver and vehicle verification method is set. This is a practical starting list, not a legal or safety certificate.

When to use it

The dispatch in-charge uses this list when setting up or approving this activity. Allow about 10 minutes for the checks, plus time for any problem found. Work from the dispatch plan, packing list and document folder. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: details and agreements before using a new transporter. First confirm transporter legal details are obtained, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The dispatch in-charge records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when loading responsibility is agreed cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking driver and vehicle verification method is set without looking at the actual item or source record.
  • Writing "done" when damage reporting method is agreed has not been checked.
  • Closing the sheet even though emergency contact is saved is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a pharma business, adapt the references to the part, lot, machine or delivery document your team actually uses. In packaging, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the dispatch in-charge which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked `` need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the transporter onboarding checklist?

The dispatch in-charge who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →