lamp.
ResourcesPricingAbout
Safety12 checksweeklyabout 12 minutes, estimate; adjust for site

Safety walk checklist

This checklist covers what to look at on a 20-minute weekly walk. Tick each item at the point of work and record any failure.

0 of 12 checked

1Check people and area

  • Aisles are clear of obstacles
  • Machine guards are presentMUST
  • Fire exits are unobstructedMUST
  • Spills are cordoned or cleaned

2Check controls and equipment

  • Loose wiring is reported
  • Lifting equipment condition is checked visually
  • Unsafe stacking is reported
  • Safety gear is seen on relevant jobsMUST

3Act on findings

  • Open hazard list is updated
  • Immediate risks are escalated
  • Correction owner is named
  • Next walk date is recordedMUST
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Aisles are clear of obstacles; Machine guards are present; Fire exits are unobstructed; Loose wiring is reported. This is a practical starting list, not a legal or safety certificate.

When to use it

The safety in-charge uses this list on the selected weekly review day. Allow about 12 minutes for the checks, plus time for any problem found. Work from the site inspection register and the marked work area. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: what to look at on a 20-minute weekly walk. First confirm aisles are clear of obstacles, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The safety in-charge records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when loose wiring is reported cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking machine guards are present without looking at the actual item or source record.
  • Writing "done" when lifting equipment condition is checked visually has not been checked.
  • Closing the sheet even though open hazard list is updated is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a garments business, adapt the references to the part, lot, machine or delivery document your team actually uses. In engineering, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the safety in-charge which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked `` need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the safety walk checklist?

The safety in-charge who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if aisles are clear of obstacles cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →