Electrical panel inspection checklist

This checklist covers visual checks a trained person makes without opening live parts. Tick each item at the point of work and record any failure.

0 of 12 checked

1Prepare and make safe

  • Panel door is closed and intactMUST
  • Danger labels are readable
  • Access in front of panel is clear
  • No smoke or smell is observed

2Inspect or restore

  • External indicators show expected state
  • No visible water ingress is presentMUST
  • Cable entry seals look intact
  • Unusual heat is reported without touching live parts

3Test and hand over

  • Faults are referred to authorised electricianMUST
  • No unapproved opening has occurredMUST
  • Panel ID is logged
  • Inspection signature is entered
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Panel door is closed and intact; Danger labels are readable; Access in front of panel is clear; No visible water ingress is present; Faults are referred to authorised electrician; No unapproved opening has occurred. This is a practical starting list, not a legal or safety certificate.

When to use it

The authorised electrical inspector uses this list on the selected weekly review day. Allow about 10 minutes for the checks, plus time for any problem found. Work from the machine service log and maintenance register. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: visual checks a trained person makes without opening live parts. First confirm panel door is closed and intact, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The authorised electrical inspector records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when external indicators show expected state cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking danger labels are readable without looking at the actual item or source record.
  • Writing "done" when no visible water ingress is present has not been checked.
  • Closing the sheet even though faults are referred to authorised electrician is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a foundries business, adapt the references to the part, lot, machine or delivery document your team actually uses. In fabrication, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the authorised electrical inspector which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked `` need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the electrical panel inspection checklist?

The authorised electrical inspector who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if panel door is closed and intact cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →