DG set checklist
This checklist covers diesel, oil, coolant, battery and a weekly test run. Tick each item at the point of work and record any failure.
1Prepare and make safe
- Fuel level is sufficient for planned run
- Oil level is in marked range
- Coolant level is checked when safeMUST
- Battery terminals look intact
2Inspect or restore
- No visible fuel leak is presentMUST
- Exhaust route is unobstructedMUST
- Alarm panel is free of faults
- Test run is supervised per site procedure
3Test and hand over
- Run time and readings are logged
- Unusual noise is reportedMUST
- Service date is checked
- Unit is returned to standby state
Check before you rely on it. These need a check for your site or with the official source: Coolant level is checked when safe; Exhaust route is unobstructed; Test run is supervised per site procedure. This is a practical starting list, not a legal or safety certificate.
When to use it
The maintenance in-charge uses this list on the selected weekly review day. Allow about 10 minutes for the checks, plus time for any problem found. Work from the machine service log and maintenance register. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.
Its scope is specific: diesel, oil, coolant, battery and a weekly test run. First confirm fuel level is sufficient for planned run, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.
If an item is a "No"
For a failed (must) check, hold the affected work at its current stage. The maintenance in-charge records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.
For this checklist, pay particular attention when no visible fuel leak is present cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.
For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.
Common mistakes
- Ticking oil level is in marked range without looking at the actual item or source record.
- Writing "done" when exhaust route is unobstructed has not been checked.
- Closing the sheet even though run time and readings are logged is still unknown.
- Filing the page with no name, no date or no owner for failed items.
Make it your own
Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a fabrication business, adapt the references to the part, lot, machine or delivery document your team actually uses. In foundries, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.
Try the list on a real job, then ask the maintenance in-charge which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.
Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked `` need a site-specific or official-source check before use.
A checklist only works if someone ticks it, every time, and someone reads it.
Questions people ask
Who should sign the dg set checklist?
The maintenance in-charge who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.
What if fuel level is sufficient for planned run cannot be confirmed?
Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.
Can we use the short version instead of the full checklist?
Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.
Read next
- Related process
- Related problem
- Related checklist
