Rejection cost calculator
Work out what rejections and rework really cost each month using your own figures. Check the assumptions before you act on the result.
Your figures
Result
- Monthly rejection cost
- ₹55,540.00
How it is worked out
monthly cost = rejected quantity x (material + processing cost per piece) + rework hours x hourly cost + replacement freight and debit notes
monthly_rejection_cost = rejected_quantity*(material_cost_per_piece+processing_cost_per_piece)+rework_hours*hourly_rework_cost+replacement_freight+debit_notes
What it works out
The rejection cost calculator turns records from the business into a figure for this decision: what rejections and rework really cost each month. Use it when the responsible quality inspector and production supervisor needs a consistent answer for this specific task. The answer uses only the values entered. Record the measurement period beside it.
What you need
| Input | Unit | Where to find it |
|---|---|---|
| Rejected quantity (example: 180) | units | Get rejected quantity from the inspection sheet, drawing or approved lot record. |
| Material cost per piece (example: 125 ₹/piece) | ₹/piece | Check the stock ledger, stock count, approved BOM or last receipt for material cost per piece. |
| Processing cost per piece (example: 65 ₹/piece) | ₹/piece | Take processing cost per piece from the latest cost sheet, supplier quote, agreement or invoice. |
| Rework hours (example: 32 hours) | hours | Enter rework hours using the current job, register or approved business plan. |
| Hourly rework cost (example: 220 ₹/hour) | ₹/hour | Take hourly rework cost from the attendance sheet or payroll working papers. Confirm the eligible wage base. |
| Replacement freight (example: ₹4,800) | ₹ | Take replacement freight from the latest cost sheet, supplier quote, agreement or invoice. |
| Debit notes (example: ₹9,500) | ₹ | Enter debit notes using the current job, register or approved business plan. |
Use the same item, period and measurement unit for related inputs. If a figure comes from an estimate rather than an actual record, mark it as estimated. Keep your original figures beside the result.
The formula
In plain words, calculate monthly rejection cost using the measured inputs below. The expressions are shown without hidden rounding so they can be checked by hand.
- monthly rejection cost:
monthly_rejection_cost = rejected_quantity*(material_cost_per_piece+processing_cost_per_piece)+rework_hours*hourly_rework_cost+replacement_freight+debit_notes.
Formula basis: monthly cost = rejected quantity x (material + processing cost per piece) + rework hours x hourly cost + replacement freight and debit notes. The calculation assumes the named inputs describe the same job and accounting period. Keep quantities, rates and measured units consistent.
A worked example
Illustrative example: a packaging manufacturer uses the figures in the table above. These are example inputs, not industry averages. For this example, the main figures are rejected quantity: 180, material cost per piece: 125 ₹/piece, processing cost per piece: 65 ₹/piece, rework hours: 32 hours.
- Monthly rejection cost:
rejected_quantity*(material_cost_per_piece+processing_cost_per_piece)+rework_hours*hourly_rework_cost+replacement_freight+debit_notes. With the example figures,180.0 * (125.0 + 65.0) + 32.0 * 220.0 + 4800.0 + 9500.0gives ₹55,540.
How to act: Use the result to review the defect and rework record. Write down the input date and the assumption that could move most.
How to read the result
Example bands, change them for your business:
- Comfortable: Your result meets the target for this item or reporting period. Keep the calculation with its source records and review the defect and rework record.
- Watch: The result is close to your action limit, or it changed since the previous calculation. Recheck rejected quantity and material cost per piece using the original records.
- Act: The result breaks a limit already agreed by the manager or owner. Record the difference, name a responsible person, and agree a correction date. For an operational starting point, read Too many rejections and Quality issue to closure. Do not use these example bands as published industry benchmarks.
Copy it into a spreadsheet
Create a sheet with column A for the label and column B for the number or formula. The expressions work in Excel or Google Sheets. Keep input cells editable and result cells protected from typing.
| Cell | Label | Value or formula |
|---|---|---|
| B2 | rejected quantity | 180.000000 |
| B3 | material cost per piece | 125.000000 |
| B4 | processing cost per piece | 65.000000 |
| B5 | rework hours | 32.000000 |
| B6 | hourly rework cost | 220.000000 |
| B7 | replacement freight | 4800.000000 |
| B8 | debit notes | 9500.000000 |
| B10 | monthly rejection cost | =((((B2*(B3+B4))+(B5*B6))+B7)+B8) |
For any formula containing a divisor, enter a value above zero. For any monetary output, format the cell in Indian rupees. Do not replace the cells with rounded figures until the final display.
What this calculator leaves out
- A low rejection number can hide missed inspections, late customer claims or incomplete records.
- A single average can hide unusual lots, customers or weeks. Review the underlying entries before making a large decision.
- The formula does not check whether the records are complete. Use the same count, lot boundaries and units in both parts of the calculation. Keep rework separate from new output.
Common mistakes
- Mixing periods. Using rejected quantity from one month with material cost per piece from another produces a number that looks precise but is hard to act on.
- Trusting old figures. Recheck the relevant source record before reusing last month's saved inputs. Investigate the first repeated defect before accepting an average as normal.
- Treating an estimate as approval. Record which assumptions were entered by hand. Get the relevant owner, accountant or technician to check unusual values.
A number like this helps only if someone works it out again when things change.
Questions people ask
Where do I find the numbers for rejection cost calculator?
Get rejected quantity from the inspection sheet, drawing or approved lot record. Check the stock ledger, stock count, approved BOM or last receipt for material cost per piece. Keep all inputs from the same period.
Can I use this number to approve a purchase or payment?
Use it as a first check. Use the result to review the defect and rework record. Write down the input date and the assumption that could move most. If the result affects tax, legal duties, workplace safety or a major investment, obtain the appropriate review.
When should I calculate it again?
Recalculate when a meaningful input changes, and at the next regular review of the relevant register. Save the date and the input values so changes can be explained.