Order quantity calculator
Work out how much to order at a time (EOQ), with honest limits for small firms using your own figures. Check the assumptions before you act on the result.
Your figures
Result
- Economic order quantity
- 693 units
How it is worked out
EOQ = square root of (2 x annual demand x cost per order ÷ holding cost per unit per year)
economic_order_quantity = sqrt(2*annual_demand*cost_per_order/annual_holding_cost_per_unit)
What it works out
The order quantity calculator turns records from the business into a figure for this decision: how much to order at a time (EOQ), with honest limits for small firms. Use it when the responsible stores manager and purchase manager needs a consistent answer for this specific task. The answer uses only the values entered. Record the measurement period beside it.
What you need
| Input | Unit | Where to find it |
|---|---|---|
| Annual demand (example: 12,000 units/year) | units/year | Enter annual demand using the current job, register or approved business plan. |
| Cost per order (example: 900 ₹/order) | ₹/order | Take cost per order from the latest cost sheet, supplier quote, agreement or invoice. |
| Annual holding cost per unit (example: 45 ₹/unit/year) | ₹/unit/year | Take annual holding cost per unit from the latest cost sheet, supplier quote, agreement or invoice. |
Use the same item, period and measurement unit for related inputs. If a figure comes from an estimate rather than an actual record, mark it as estimated. Keep your original figures beside the result.
The formula
In plain words, calculate economic order quantity using the measured inputs below. The expressions are shown without hidden rounding so they can be checked by hand.
- economic order quantity:
economic_order_quantity = sqrt(2*annual_demand*cost_per_order/annual_holding_cost_per_unit).
Formula basis: EOQ = square root of (2 x annual demand x cost per order ÷ holding cost per unit per year). The calculation assumes the named inputs describe the same job and accounting period. Keep quantities, rates and measured units consistent.
A worked example
Illustrative example: a foundry uses the figures in the table above. These are example inputs, not industry averages. For this example, the main figures are annual demand: 12,000 units/year, cost per order: 900 ₹/order, annual holding cost per unit: 45 ₹/unit/year.
- Economic order quantity:
sqrt(2*annual_demand*cost_per_order/annual_holding_cost_per_unit). With the example figures,sqrt(2 * 12000.0 * 900.0 / 45.0)gives 692.82.
How to act: Use the result to compare it with the next purchase date. Write down the input date and the assumption that could move most.
How to read the result
Example bands, change them for your business:
- Comfortable: Your result meets the target for this item or reporting period. Keep the calculation with its source records and compare it with the next purchase date.
- Watch: The result is close to your action limit, or it changed since the previous calculation. Recheck annual demand and cost per order using the original records.
- Act: The result breaks a limit already agreed by the manager or owner. Record the difference, name a responsible person, and agree a correction date. For an operational starting point, read Material shortages and Purchase requirement to material received. Do not use these example bands as published industry benchmarks.
Copy it into a spreadsheet
Create a sheet with column A for the label and column B for the number or formula. The expressions work in Excel or Google Sheets. Keep input cells editable and result cells protected from typing.
| Cell | Label | Value or formula |
|---|---|---|
| B2 | annual demand | 12000.000000 |
| B3 | cost per order | 900.000000 |
| B4 | annual holding cost per unit | 45.000000 |
| B6 | economic order quantity | =SQRT((((2*B2)*B3)/B4)) |
For any formula containing a divisor, enter a value above zero. For any monetary output, format the cell in Indian rupees. Do not replace the cells with rounded figures until the final display.
What this calculator leaves out
- Demand jumps, seasonality, minimum supplier order sizes and rejected receipts can change the decision.
- Economic order quantity assumes fairly steady demand and fixed ordering and holding costs. Quantity discounts and supplier pack sizes may override it.
- The formula does not check whether the records are complete. Check the stores register and the open PO list before buying. A number from last quarter may no longer represent the next delivery.
Common mistakes
- Mixing periods. Using annual demand from one month with cost per order from another produces a number that looks precise but is hard to act on.
- Trusting old figures. Recheck the relevant source record before reusing last month's saved inputs. If the calculated number conflicts with a physical stock count, reconcile the shelf and the book before placing an order.
- Treating an estimate as approval. Record which assumptions were entered by hand. Get the relevant owner, accountant or technician to check unusual values.
A number like this helps only if someone works it out again when things change.
Questions people ask
Where do I find the numbers for order quantity calculator?
Enter annual demand using the current job, register or approved business plan. Take cost per order from the latest cost sheet, supplier quote, agreement or invoice. Keep all inputs from the same period.
Can I use this number to approve a purchase or payment?
Use it as a first check. Use the result to compare it with the next purchase date. Write down the input date and the assumption that could move most. If the result affects tax, legal duties, workplace safety or a major investment, obtain the appropriate review.
When should I calculate it again?
Recalculate when a meaningful input changes, and at the next regular review of the relevant register. Save the date and the input values so changes can be explained.