Casting yield calculator
Work out how much poured metal ends up as saleable castings using your own figures. Check the assumptions before you act on the result.
Your figures
Result
- Casting yield percent
- 60.18%
How it is worked out
yield % = weight of good castings ÷ weight of metal poured x 100
casting_yield_percent = good_castings_kg/metal_poured_kg*100
Check before you rely on it. Confirm boundary between poured metal and saleable castings. Have an accountant or the right specialist check any figure that affects tax, a legal duty, safety or a large purchase.
What it works out
The casting yield calculator turns records from the business into a figure for this decision: how much poured metal ends up as saleable castings. Use it when the responsible production or costing manager needs a consistent answer for this specific task. The answer uses only the values entered. Record the measurement period beside it.
What you need
| Input | Unit | Where to find it |
|---|---|---|
| Good castings kg (example: 680 kg) | kg | Enter good castings kg using the current job, register or approved business plan. |
| Metal poured kg (example: 1,130 kg) | kg | Enter metal poured kg using the current job, register or approved business plan. |
Use the same item, period and measurement unit for related inputs. If a figure comes from an estimate rather than an actual record, mark it as estimated. Keep your original figures beside the result.
The formula
In plain words, calculate casting yield percent using the measured inputs below. The expressions are shown without hidden rounding so they can be checked by hand.
- casting yield percent:
casting_yield_percent = good_castings_kg/metal_poured_kg*100.
Formula basis: yield % = weight of good castings ÷ weight of metal poured x 100. The calculation assumes the named inputs describe the same job and accounting period. Keep quantities, rates and measured units consistent.
A worked example
Illustrative example: a plastics moulding unit uses the figures in the table above. These are example inputs, not industry averages. For this example, the main figures are good castings kg: 680 kg, metal poured kg: 1,130 kg.
- Casting yield percent:
good_castings_kg/metal_poured_kg*100. With the example figures,680.0 / 1130.0 * 100gives 60.18 %.
How to act: Use the result to test the estimate against one physical sample. Write down the input date and the assumption that could move most.
How to read the result
Example bands, change them for your business:
- Comfortable: Your result meets the target for this item or reporting period. Keep the calculation with its source records and test the estimate against one physical sample.
- Watch: The result is close to your action limit, or it changed since the previous calculation. Recheck good castings kg and metal poured kg using the original records.
- Act: The result breaks a limit already agreed by the manager or owner. Record the difference, name a responsible person, and agree a correction date. For an operational starting point, read Quoting without real cost and Costing a new part. Do not use these example bands as published industry benchmarks.
Copy it into a spreadsheet
Create a sheet with column A for the label and column B for the number or formula. The expressions work in Excel or Google Sheets. Keep input cells editable and result cells protected from typing.
| Cell | Label | Value or formula |
|---|---|---|
| B2 | good castings kg | 680.000000 |
| B3 | metal poured kg | 1130.000000 |
| B5 | casting yield percent | =((B2/B3)*100) |
For any formula containing a divisor, enter a value above zero. For any monetary output, format the cell in Indian rupees. Do not replace the cells with rounded figures until the final display.
What this calculator leaves out
- Process loss, material grade, production method and customer tolerance may change the result.
- A single average can hide unusual lots, customers or weeks. Review the underlying entries before making a large decision.
- The formula does not check whether the records are complete. Take dimensions and weights from the approved drawing, sample or batch record. Confirm the unit before typing.
Common mistakes
- Mixing periods. Using good castings kg from one month with metal poured kg from another produces a number that looks precise but is hard to act on.
- Trusting old figures. Recheck the relevant source record before reusing last month's saved inputs. Check a trial sample against the calculated amount before committing a large order.
- Treating an estimate as approval. Record which assumptions were entered by hand. Get the relevant owner, accountant or technician to check unusual values.
A number like this helps only if someone works it out again when things change.
Questions people ask
Where do I find the numbers for casting yield calculator?
Enter good castings kg using the current job, register or approved business plan. Enter metal poured kg using the current job, register or approved business plan. Keep all inputs from the same period.
Can I use this number to approve a purchase or payment?
Use it as a first check. Use the result to test the estimate against one physical sample. Write down the input date and the assumption that could move most. If the result affects tax, legal duties, workplace safety or a major investment, obtain the appropriate review.
When should I calculate it again?
Recalculate when a meaningful input changes, and at the next regular review of the relevant register. Save the date and the input values so changes can be explained.